Eaton Logo

What connections need to be made to an Enclosed Meter at the installation site?

The Enclosed Meters come prewired with CT inputs, voltage inputs, and control power inputs.
 
Connections needing to be brought into the Enclosure at the installation site would include CTs, voltage, ground, control power (if required), communication, and optional I/O (if required).